Methodology
A
preliminary survey was conducted by AFPRO team in
Dhemaji district. The flood affected and flood prone
areas have been identified along with the existing
system of farming and livelihood opportunities.
Accordingly critical gaps were identified based on the
present situation which has been prioritized. Meetings
with implementing partners to short out
the
root causative factors during flood and post flood
situation which were analyzed and prioritized.
Farm systems
having similar resource base, enterprise patterns,
household livelihoods, rural skills, constraints
requiring similar development strategies and
interventions were identified. The flood affected areas
of four blocks were identified and three clusters were
formed depending on the socio-economic and agro climatic
situations.
The
interventions were selected to fit in three major
situations in the project areas like Pre Flood,
Disaster Preparedness and Post Flood situation.
Integrated Farming System along with back up support of
related interventions were sorted out at family level as
a unit in three flood related situations.
Research findings / tested technologies of several
premier institutions will be blended along with model of
AAU (for IFS) as per the suitability and local context
in order to improve the efficiency of the interventions
so as to bring rapid action and/or impact. The modules
consisted of rice, fish, livestock (cattle, pig and
goat)/poultry,
horticulture (fruit and vegetables) and fodder.
Project
delivery mechanism
The project delivery
mechanism shall consist
-
Development of road
map, plan and implementation strategy shall be prepared on the basis of farm
households, agro-ecological situations, critical adoption gap and farmers needs.
-
Execution, regular
monitoring and communication with target group.
-
Strengthening quality
monitoring through on site stay.
-
Capacity building and
skill up gradation technical know-how and field
based training
-
Timely modification
based on requirements. Provision for Mid Term Review.
-
Documentation of the
project
|